Home

Products & Services

Contracting Services

In-House Trades

Feasibility Study

Architecture

Finance Options

ADA Code Compliances

Fire-Life Safety

Wardergroup Difference

Your Vision

The Process

Feasibility - Master Plan

Financing

Architecture-Site Design

Permit Processing

Construction

Portfolio

About Us

Our People

Mission & Pledge

Contact Us

Subs & Trades

Registration

Agape

Beth Shalom

Clinton Church of Christ

First Haitian Free Church

Mt Olive Baptist

Washington 7th Day Baptis

St. Mary's Baptist Church

Extras for You

Project Status Reports

Great links

Wardergroup Coupon

Newsletters

Blog

Glossary

Maintainence Checklist

Check for Land



Permits

Permits and their Processing


Permits processing is one of the most time-consuming parts of the design/build process; not because it is difficult to apply for permits but because the approval process can take so very long.

The specifics of the permit requirements vary from jurisdiction to jurisdiction but generally include both the Site/Grading Permit, the Building Permit, numerous inspections, and at last, the Occupancy Permit. The time it takes to process the permits can vary widely from jurisdiction to jurisdiction; taking as little time as six months and as much time as over a year, for just the Site/Grading Permit. The filing with the state and county or restoration, utility bonds and utility company fees may add even more time to the process. It is important to factor the time it takes into your time expectations.

The Site/Grading Permit includes:
  • Grading & Sediment Control Plans
  • Storm Water Management Plans
  • Landscaping Plans
  • Tree Conservation Plan (TCP)
  • Site Utilities Plan
  • Engineering Certification
  • Site (Geometric) Plan which includes:
    • The building Parameter
    • Parking Requirements
    • Property Boundaries
    • Etc.
The Building Permit includes:
  • Architectural drawings
  • Structural drawings
  • Mechanical drawings
  • Electrical drawings
  • Plumbing plans
  • Above site drawing
  • Other drawings particular to your structure
  • Etc.

Permits
Materials
More materials
After the permits are obtained, construction can begin.


During construction, numerous inspectors come out to ensure that every item in each of the plans is being done EXACTLY the way they are shown in the plan. Sometimes, during the site development work phase, the site engineers want something done a little differently that that shown on the approved plan. Changes are made to the plan ONLY upon approval of the site engineer or architect and filed as revisions in the local jurisdiction
.

The Occupancy Permit:

This is the final moment in the process. Now you can move into your new facility and celebrate!



 

Home | Your Vision | The Process | Wardergroup Difference
Portfolio | About Us | Contact Us | Extras For You

(301) 868-5900 (Maryland local)
(866) 374-9390 (toll free)
(301) 868-8192 (fax)

©Copyright 2007 Warder & Associates, Inc. and Wardergroup of Florida, Inc. All Rights Reserved.

Your Web Site Name

Your Web Site's Slogan